The building, designed by the IBI Group, would feature a six-storey “podium design,” topped with a 24-storey residential tower. The 418 residential units in the building would likely be condominium units, consisting of 79 studios, 229 single-bedroom units, 67 two-bedroom units, and 43 three-bedroom units.
NEWS: 30-storey tower to replace Metro (Feb. 2023)
March 27th, 2023 · Comments Off on NEWS: 30-storey tower to replace Metro (Feb. 2023)
Chatter (Nov. 2017): Bloor Annex BIA updates street revitalization plan
November 24th, 2017 · Comments Off on Chatter (Nov. 2017): Bloor Annex BIA updates street revitalization plan
The Bloor Annex Business Improvement Area (BIA) met this month to discuss the upcoming, and much anticipated, Bloor Street revitalization plan due in 2019. Spanning Madison Avenue to Bathurst Street, the BIA intends to replace the tree planter boxes with new trees that will be level with the sidewalk. A proprietary root system has been […]
POLICE BLOTTER (JANUARY 2017): Three men sought in taxi assault and robbery
January 23rd, 2017 · Comments Off on POLICE BLOTTER (JANUARY 2017): Three men sought in taxi assault and robbery
The Toronto Police Service is looking for three men in connection with an assault and robbery of a taxi driver near Russell and Robert streets on Dec. 18 at approximately 3 a.m. It is alleged that the three men were picked up by the taxi a short distance away before asking to stop near the […]
